C-Reactor I and E loading instability limits
Abstract
The pilot charging of I & E fuel elements has been implemented at C-Reactor under Production Test IP-19-A. It was necessary to provide adequate tube protection against flow interruption by establishing proper trip setting on the Panellit pressure gauges. the administration of these Panellit trip settings is done by trip-before- boiling tube outlet temperature limits, which are similar in principle to the current instability limits. Trip-before-boiling limits for C-Reactor I & E fuel elements loadings are presented in this document.
- Authors:
- Publication Date:
- Research Org.:
- General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
- Sponsoring Org.:
- USDOE, Washington, DC (United States)
- OSTI Identifier:
- 10106479
- Report Number(s):
- HW-47150
ON: DE93003934
- DOE Contract Number:
- AC06-76RL01830
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 24 Jan 1957
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 22 GENERAL STUDIES OF NUCLEAR REACTORS; C REACTOR; REACTOR FUELING; REACTOR INSTRUMENTATION; PRESSURE GAGES; TESTING; LIMITING VALUES; STABILITY; TEMPERATURE MEASUREMENT; REACTOR CHANNELS; 220400; 220600; 220900; CONTROL SYSTEMS; RESEARCH, TEST, TRAINING, PRODUCTION, IRRADIATION, MATERIALS TESTING REACTORS; REACTOR SAFETY
Citation Formats
Hess, K W. C-Reactor I and E loading instability limits. United States: N. p., 1957.
Web. doi:10.2172/10106479.
Hess, K W. C-Reactor I and E loading instability limits. United States. https://doi.org/10.2172/10106479
Hess, K W. 1957.
"C-Reactor I and E loading instability limits". United States. https://doi.org/10.2172/10106479. https://www.osti.gov/servlets/purl/10106479.
@article{osti_10106479,
title = {C-Reactor I and E loading instability limits},
author = {Hess, K W},
abstractNote = {The pilot charging of I & E fuel elements has been implemented at C-Reactor under Production Test IP-19-A. It was necessary to provide adequate tube protection against flow interruption by establishing proper trip setting on the Panellit pressure gauges. the administration of these Panellit trip settings is done by trip-before- boiling tube outlet temperature limits, which are similar in principle to the current instability limits. Trip-before-boiling limits for C-Reactor I & E fuel elements loadings are presented in this document.},
doi = {10.2172/10106479},
url = {https://www.osti.gov/biblio/10106479},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jan 24 00:00:00 EST 1957},
month = {Thu Jan 24 00:00:00 EST 1957}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.