skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RHIC PERFORMANCE DURING THE FY10 200 GeV Au+Au HEAVY ION RUN

Conference ·
OSTI ID:984410

Since the last successful RHIC Au+Au run in 2007 (Run-7), the RHIC experiments have made numerous detector improvements and upgrades. In order to benefit from the enhanced detector capabilities and to increase the yield of rare events in the acquired heavy ion data a significant increase in luminosity is essential. In Run-7 RHIC achieved an average store luminosity of <L> = 12 x 10{sup 26} cm{sup -2} s{sup -1} by operating with 103 bunches (out of 111 possible), and by squeezing to {beta}* = 0.85 m. This year, Run-10, we achieved <L> = 20 x 10{sup 26} cm{sup -2} s{sup -1}, which put us an order of magnitude above the RHIC design luminosity. To reach these luminosity levels we decreased {beta}* to 0.75 m, operated with 111 bunches per ring, and reduced longitudinal and transverse emittances by means of bunched-beam stochastic cooling. In addition we introduced a lattice to suppress intra-beam scattering (IBS) in both RHIC rings, upgraded the RF control system, and separated transition crossing times in the two rings. We present an overview of the changes and the results of Run-10 performance.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States). Relativistic Heavy Ion Collider (RHIC)
Sponsoring Organization:
Doe - Office Of Science
DOE Contract Number:
DE-AC02-98CH10886
OSTI ID:
984410
Report Number(s):
BNL-90754-2010-CP; R&D Project: KBCH139; KB0202011; TRN: US1005299
Resource Relation:
Conference: First International Particle Accelerator Conference (IPAC) 2010; Kyoto, Japan; 20100523 through 20100528
Country of Publication:
United States
Language:
English

Similar Records

RHIC low energy beam loss projections
Technical Report · Sat Aug 01 00:00:00 EDT 2009 · OSTI ID:984410

SUMMARY OF THE RHIC PERFORMANCE DURING THE FY07 HEAVY ION RUN
Conference · Mon Jun 25 00:00:00 EDT 2007 · OSTI ID:984410

RHIC Au beam in Run 2014
Technical Report · Mon Sep 15 00:00:00 EDT 2014 · OSTI ID:984410