skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Spallation Neutron Source high-power Rf transmitter design for high availablility, ease of installation and cost containment

Conference ·
OSTI ID:976665

The availability goals and installation schedule for the Spallation Neutron Source (SNS) have driven the availability and installation of the SNS linac's high-power RF systems. This paper discusses how the high-power RF systems' availability and installation goals have been addressed in the RF transmitter design and procurement. Design features that allow R1; component failures to be quickly diagnosed and repaired are also presented. Special attention has been given lo interlocks, PLC fault logging and real-time interfaces to thc accelerator's Experimental Physics and Industrial Control System (EPICS) archive system. The availability and cost motivations for the use of different RF transmitter designs in the normalconducting and super-conducting sections of the linac are reviewed. Factory iicceptance tests used to insure fully functional equipment and thereby reduce the time spent on installation and cotnmissioning of the RF transmitters are discussed. Transmitter installation experience and klystron conditioning experience is used to show how these design features have helped and will continue to help the SNS linac to meet its availability and schedule goals.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
OSTI ID:
976665
Report Number(s):
LA-UR-03-3216; TRN: US1006522
Resource Relation:
Conference: Submitted to: IEEE PAC-2003, Portland, OR, May 12-16, 2003
Country of Publication:
United States
Language:
English