The 8-GeV transfer line injection into main ring
Included in this report are a brief review of the design lattice of the 8-GeV beam transfer line and the Main Ring, the recent measurements on the 8-GeV line lattice function as well as that of the Main Ring at 8-GeV. The injection matching is a very important part of the MR operation. Mismatches such as energy, timing, or position are easily corrected because they cause oscillations which are visible on the Turn-By-Turn (TBT) TV monitor display. Mis-matches due to beta and dispersion functions are detected only by using the Flying Wire or by doing measurements during beam study. A new method which makes use of the available data from TBT hardware was used to obtain the beam phase space ellipse. Data taken from Main Ring at injection gives the beta function needed for transfer matching from 8-GeV line. The result of this measurement is also presented here.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 95277
- Report Number(s):
- FNAL-TM-1923; ON: DE95016697; TRN: 95:018684
- Resource Relation:
- Other Information: PBD: Jun 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design of an 8 GeV h transport and multi-turn injection system
The transport line between the main ring and the energy doubler