Low Beam Voltage, 10 MW, L-Band Cluster Klystron
Conceptual design of a multi-beam klystron (MBK) for possible ILC and Project X applications is presented. The chief distinction between this MBK design and existing 10-MW MBK's is the low operating voltage of 60 kV. There are at least four compelling reasons that justify development at this time of a low-voltage MBK, namely (1) no pulse transformer; (2) no oil tank for high-voltage components and for the tube socket; (3) no high-voltage cables; and (4) modulator would be a compact 60-kV IGBT switching circuit. The proposed klystron consists of four clusters containing six beams each. The tube has common input and output cavities for all 24 beams, and individual gain cavities for each cluster. A closely related optional configuration, also for a 10 MW tube, would involve four totally independent cavity clusters with four independent input cavities and four 2.5 MW output ports, all within a common magnetic circuit. This option has appeal because the output waveguides would not require a controlled atmosphere, and because it would be easier to achieve phase and amplitude stability as required in individual SC accelerator cavities.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 952642
- Report Number(s):
- FERMILAB-CONF-09-185-TD; TRN: US0902564
- Resource Relation:
- Conference: Presented at Particle Accelerator Conference (PAC 09), Vancouver, BC, Canada, 4-8 May 2009
- Country of Publication:
- United States
- Language:
- English
Similar Records
A 200 MHz 35 MW Multiple Beam Klystron for Accelerator Applications Final Report
Development of a 50 MW Multiple Beam Klystron