Fermilab Main Injector Collimation Systems: Design, Commissioning and Operation
The Fermilab Main Injector is moving toward providing 400 kW of 120 GeV proton beams using slip stacking injection of eleven Booster batches. Loss of 5% of the beam at or near injection energy results in 1.5 kW of beam loss. A collimation system has been implemented to localize this loss with the design emphasis on beam not captured in the accelerating RF buckets. More than 95% of these losses are captured in the collimation region. We will report on the construction, commissioning and operation of this collimation system. Commissioning studies and loss measurement tools will be discussed. Residual radiation monitoring of the Main Injector machine components will be used to demonstrate the effectiveness of these efforts.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 952256
- Report Number(s):
- FERMILAB-CONF-09-167-AD; TRN: US0902450
- Resource Relation:
- Conference: Presented at Particle Accelerator Conference (PAC 09), Vancouver, BC, Canada, 4-8 May 2009
- Country of Publication:
- United States
- Language:
- English
Similar Records
Collimation system for beam loss localization with slip stacking injection in the Fermilab Main Injector
Fermilab Recycler Collimation System Design