Title: Fermilab Main Injector Collimation Systems: Design, Commissioning and Operation

Conference ·
OSTI ID:952256

The Fermilab Main Injector is moving toward providing 400 kW of 120 GeV proton beams using slip stacking injection of eleven Booster batches. Loss of 5% of the beam at or near injection energy results in 1.5 kW of beam loss. A collimation system has been implemented to localize this loss with the design emphasis on beam not captured in the accelerating RF buckets. More than 95% of these losses are captured in the collimation region. We will report on the construction, commissioning and operation of this collimation system. Commissioning studies and loss measurement tools will be discussed. Residual radiation monitoring of the Main Injector machine components will be used to demonstrate the effectiveness of these efforts.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
952256
Report Number(s):
FERMILAB-CONF-09-167-AD; TRN: US0902450
Resource Relation:
Conference: Presented at Particle Accelerator Conference (PAC 09), Vancouver, BC, Canada, 4-8 May 2009
Country of Publication:
United States
Language:
English