skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Site Characterization Report ORGDP Diffusion Facilities Permanent Shutdown K-700 Power House and K-27 Switch Yard/Switch House

Technical Report ·
DOI:https://doi.org/10.2172/949984· OSTI ID:949984

The K-700 Power House area, initially built to supply power to the K-25 gaseous diffusion plant was shutdown and disassembled in the 1960s. This shutdown was initiated by TVA supplying economical power to the diffusion plant complex. As a result of world wide over production of enriched, reactor grade U{sup 235}, the K-27 switch yard and switch house area was placed in standby in 1985. Subsequently, as the future production requirements decreased, the cost of production increased and the separation technologies for other processes improved, the facility was permanently shutdown in December, 1987. This Site Characterization Report is a part of the FY-88 engineering Feasibility Study for placing ORGDP Gaseous Diffusion Process facilities in 'Permanent Shutdown'. It is sponsored by the Department of Energy through Virgil Lowery of Headquarters--Enrichment and through Don Cox of ORO--Enrichment Operations. The primary purpose of these building or site characterization reports is to document, quantify, and map the following potential problems: Asbestos; PCB containing fluids; Oils, coolants, and chemicals; and External contamination. With the documented quantification of the concerns (problems) the Engineering Feasibility Study will then proceed with examining the potential solutions. For this study, permanent shutdown is defined as the securing and/or conditioning of each facility to provide 20 years of safe service with minimal expenditures and, where feasible, also serving DOE's needs for long-term warehousing or other such low-risk use. The K-700 power house series of buildings were either masonry construction or a mix of masonry and wood. The power generating equipment was removed and sold as salvage in the mid 1960s but the buildings and auxiliary equipment were left intact. The nine ancillary buildings in the power house area use early in the Manhattan Project for special research projects, were left intact minus the original special equipment. During the late 1960s and 1970s, some of the abandoned buildings were used for offices, special projects, and storage. Some of the remaining electrical transformers contain PCBs in concentrations less than 500 ppm. Many of the steam and hot water pipes in the buildings are insulated with asbestos insulation, but none of the equipment or buildings have high counts of surface radioactive contamination. The general conditions of the buildings are from fair to poor. Many should be boarded-up to prevent personnel entry and in some cases demolitions would be the safer alternative.

Research Organization:
East Tennessee Technology Park (ETTP), Oak Ridge, TN
Sponsoring Organization:
USDOE Assistant Secretary for Environmental Management (EM)
DOE Contract Number:
DE-AC05-98OR22700
OSTI ID:
949984
Report Number(s):
KD-5773; TRN: US200913%%208
Country of Publication:
United States
Language:
English