EBIS preinjector construction status
A new heavy ion preinjector is presently under construction at Brookhaven National Laboratory. This preinjector uses an Electron Beam Ion Source (EBIS), and an WQ and IH Linac, both operating at 100.625 MHz, to produce 2 MeV/u ions of any species for use, after further acceleration, at the Relativistic Heavy Ion Collider, and the NASA Space Radiation Laboratory. Among the increased capabilities provided by this preinjector are the ability to produce ions of any species, and the ability to switch between multiple species in 1 second, to simultaneously meet the needs of both physics programs. Fabrication of all major components for this preinjector is in process, with testing of the EBIS and WQ starting this year. The status of this construction is presented.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- Doe - Office Of Science
- DOE Contract Number:
- DE-AC02-98CH10886
- OSTI ID:
- 939958
- Report Number(s):
- BNL-81635-2008-CP; R&D Project: 18033; KB0202011; TRN: US0806921
- Resource Relation:
- Conference: XXIV Linear Accelerator Conference (LINAC08); Victoria, British Columbia, Canada; 20080929 through 20081003
- Country of Publication:
- United States
- Language:
- English
Similar Records
Construction of the BNL EBIS preinjector
HIGH PERFORMANCE EBIS FOR RHIC.