Title: Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

Abstract

The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

Publication Date:
Research Org.:
US Department of Energy (USDOE), Washington DC (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
93536
Report Number(s):
DOE/EA-1007
ON: DE95014525; NC: NONE
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Apr 1995
Country of Publication:
United States
Language:
English
Subject:
29 ENERGY PLANNING AND POLICY; 20 FOSSIL-FUELED POWER PLANTS; COMBINED-CYCLE POWER PLANTS; DEMONSTRATION PROGRAMS; ENVIRONMENTAL IMPACT STATEMENTS; FOSSIL-FUEL POWER PLANTS

Citation Formats

. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project. United States: N. p., 1995. Web. doi:10.2172/93536.
. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project. United States. https://doi.org/10.2172/93536
. 1995. "Environmental Assessment for the Warren Station externally fired combined cycle demonstration project". United States. https://doi.org/10.2172/93536. https://www.osti.gov/servlets/purl/93536.
@article{osti_93536,
title = {Environmental Assessment for the Warren Station externally fired combined cycle demonstration project},
author = {},
abstractNote = {The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.},
doi = {10.2172/93536},
url = {https://www.osti.gov/biblio/93536}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Apr 01 00:00:00 EST 1995},
month = {Sat Apr 01 00:00:00 EST 1995}
}