Upgrades to the Fermilab NuMI beamline
Conference
·
· Conf.Proc.C070625:1712,2007
The NuMI beamline at Fermilab has been delivering high-intensity muon neutrino beams to the MINOS experiment since the spring of 2005. A total of 3.4 x 10{sup 20} protons has been delivered to the NuMI target and a maximum beam power of 320 kW has been achieved. An upgrade of the NuMI facility increasing the beam power capability to 700 kW is planned as part of the NOvA experiment. The plans for this upgrade are presented and the possibility of upgrading the NuMI beamline to handle 1.2 MW is considered.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 921996
- Report Number(s):
- FERMILAB-CONF-07-629-AD; TRN: US0801061
- Journal Information:
- Conf.Proc.C070625:1712,2007, Conference: Prepared for Particle Accelerator Conference (PAC 07), Albuquerque, New Mexico, 25-29 Jun 2007
- Country of Publication:
- United States
- Language:
- English
Similar Records
Beam intensity upgrade at Fermilab
Tritium transport in the NuMI decay pipe region - modeling and comparison with experimental data
A large liquid argon time projection chamber for long-baseline, off-axis neutrino oscillation physics with the NuMI beam
Conference
·
Sat Jul 01 00:00:00 EDT 2006
·
OSTI ID:921996
Tritium transport in the NuMI decay pipe region - modeling and comparison with experimental data
Technical Report
·
Thu Mar 01 00:00:00 EST 2007
·
OSTI ID:921996
A large liquid argon time projection chamber for long-baseline, off-axis neutrino oscillation physics with the NuMI beam
Technical Report
·
Thu Sep 01 00:00:00 EDT 2005
·
OSTI ID:921996
+15 more