skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: A Complete Scheme of Ionization Cooling for a Muon Collider

Conference · · Conf.Proc.C070625:3193,2007

The conclusions of this report are: (1) New 1.5 TeV Collider lattice has more conservative IP parameters--(a) Luminosity 1 x 10{sup 34} achieved with bunch rep rate {approx}12 Hz but requires depth {approx}135 (m) to limit neutrino radiation, (b) Collider ring must be deep (eg 135 m of ILC) to control neutrino radiation, and (c) Proton driver ({approx}4 MW) is challenging; (2) Complete cooling scheme achieves required muon parameters--All components simulated (at some level) with realistic parameters, but much work remains; (3) Possible problem with rf breakdown in specified magnetic fields--Solutions with gas in cavities appear to work, and designs with open cell rf are promising; and (4) Lower cost acceleration possible using pulsed magnets in synchrotrons--Rings fit in Tevatron tunnel, and second ring uses hybrid of fixed and pulsed magnets.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
921988
Report Number(s):
FERMILAB-CONF-07-682-APC; arXiv eprint number arXiv:0711.4275; TRN: US0801053
Journal Information:
Conf.Proc.C070625:3193,2007, Conference: To appear in the proceedings of Particle Accelerator Conference (PAC 07), Albuquerque, New Mexico, 25-29 Jun 2007
Country of Publication:
United States
Language:
English

Similar Records

Coherent synchrotron radiation in the isochronous muon collider ring
Conference · Tue Oct 01 00:00:00 EDT 1996 · OSTI ID:921988

A COMPLETE SCHEME FOR A MUON COLLIDER.
Conference · Sat Sep 01 00:00:00 EDT 2007 · OSTI ID:921988

Muon Muon Collider: Feasibility Study
Conference · Thu Apr 05 00:00:00 EDT 2012 · eConf C960625:R4,1996 · OSTI ID:921988