Title: INTEC CPP-603 Basin Water Treatment System Closure: Process Design

Technical Report ·
DOI:https://doi.org/10.2172/910971· OSTI ID:910971

This document describes the engineering activities that have been completed in support of the closure plan for the Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603 Basin Water Treatment System. This effort includes detailed assessments of methods and equipment for performing work in four areas: 1. A cold (nonradioactive) mockup system for testing equipment and procedures for vessel cleanout and vessel demolition. 2. Cleanout of process vessels to meet standards identified in the closure plan. 3. Dismantlement and removal of vessels, should it not be possible to clean them to required standards in the closure plan. 4. Cleanout or removal of pipelines and pumps associated with the CPP-603 basin water treatment system. Cleanout standards for the pipes will be the same as those used for the process vessels.

Research Organization:
Idaho National Lab. (INL), Idaho Falls, ID (United States)
Sponsoring Organization:
DOE - EM
DOE Contract Number:
DE-AC07-99ID-13727
OSTI ID:
910971
Report Number(s):
INEEL/EXT-02-01139; TRN: US0704319
Country of Publication:
United States
Language:
English