PROGRESS IN TUNE, COUPLING, AND CHROMATICITY MEASUREMENT AND FEEDBACK DURING RHIC RUN 7
Tune feedback was first implemented in RHIC in 2002, as a specialist activity. The transition of the tune feedback system to full operational status was impeded by dynamic range problems, as well as by overall loop instabilities driven by large coupling. The dynamic range problem was solved by the CERN development of the Direct Diode Detection Analog Front End. Continuous measurement of all projections of the betatron eigenmodes made possible the world's first implementation of coupling feedback during beam acceleration, resolving the problem of overall loop instabilities. Simultaneous tune and coupling feedbacks were utilized as specialist activities for ramp development during the 2006 RHIC run. At the beginning of the 2007 RHIC run there remained two obstacles to making these feedbacks fully operational in RHIC - chromaticity measurement and control, and the presence of strong harmonics of the power line frequency in the betatron spectrum. We report on progress in tune, coupling, and chromaticity measurement and feedback, and discuss the relevance of our results to LHC commissioning.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- Doe - Office Of Science
- DOE Contract Number:
- DE-AC02-98CH10886
- OSTI ID:
- 910430
- Report Number(s):
- BNL-77664-2007-CP; R&D Project: 18037; TRN: US0704229
- Resource Relation:
- Conference: 22ND PARTICLE ACCELERATOR CONFERENCE; ALBUQUERQUE, NEW MEXICO; 20070625 through 20070629
- Country of Publication:
- United States
- Language:
- English
Similar Records
Summary of coupling and tune feedback results during RHIC run 6, and possible implications for LHC commissioning
SUMMARY OF COUPLING AND TUNE FEEDBACK RESULTS DURING RHIC RUN 6, AND POSSIBLE IMPLICATIONS FOR LHC COMMISSIONING.