Final Scientific/Technical Report
Boeing Phantom Works and its team originally proposed a three-year Phase III SPI project to develop a 30-kWh flywheel with a 100 kW power capability as a power risk management system (RMS) for power users and providers. The chief objectives for the Risk Management System Flywheel were to (1) demonstrate its ability to protect a critical load such as a small data center from swings in power availability, cost, and power factor and (2) show that the RMS flywheel can perform these functions with reduced noise, emissions, and operating costs when compared with non-HTS competitors including batteries, diesel generators, and microturbines.
- Research Organization:
- The Boeing Company
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- FC36-02GO12112
- OSTI ID:
- 909279
- Report Number(s):
- DOE12112; TRN: US200722%%1190
- Country of Publication:
- United States
- Language:
- English
Similar Records
Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase - Final Scientific/Technical Report
Technology Pathway Partnership Final Scientific Report
Integration of Battery Modeling with Solar Building Energy Storage
Technical Report
·
Fri Jun 29 00:00:00 EDT 2012
·
OSTI ID:909279
Technology Pathway Partnership Final Scientific Report
Technical Report
·
Thu Apr 26 00:00:00 EDT 2012
·
OSTI ID:909279
Integration of Battery Modeling with Solar Building Energy Storage
Technical Report
·
Wed Mar 21 00:00:00 EDT 2018
·
OSTI ID:909279