Survey and Alignment of the Fermilab Electron Cooling System
Conference
·
· ECONF C06092511:TU010,2006
OSTI ID:900374
The goal of achieving the Tevatron luminosity of 3 x 10{sup 32} cm{sup -2}s{sup -1} requires Electron Cooling in the Recycler Ring to provide an increased flux of antiprotons. The Fermilab Electron Cooling system has been designed to assist accumulation of antiprotons for the Tevatron collider operations. The installation along with the survey and alignment of the Electron Cooling system in the Recycler Ring were completed in November 2004. The Electron Cooling system was fully commissioned in May 2005 and the first cooling of antiprotons was achieved in July 2005. This paper discusses the alignment methodology employed to survey and align the Electron Cooling system.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 900374
- Report Number(s):
- IWAA-2006-TU010; TRN: US0702273
- Journal Information:
- ECONF C06092511:TU010,2006, Conference: In the Proceedings of: 9th International Workshop on Accelerator Alignment (IWAA 06). Menlo Park, California, 26-29 Sep 2006.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fermilab Antiproton source, Recycler ring and Main Injector
Commissioning of Fermilab's electron cooling system for 8-GeV antiprotons
Fermilab electron cooling project: Engineering aspects of cooling section
Technical Report
·
Fri Mar 22 00:00:00 EDT 2013
·
OSTI ID:900374
Commissioning of Fermilab's electron cooling system for 8-GeV antiprotons
Conference
·
Sun May 01 00:00:00 EDT 2005
·
OSTI ID:900374
+17 more
Fermilab electron cooling project: Engineering aspects of cooling section
Conference
·
Wed Jul 25 00:00:00 EDT 2001
·
OSTI ID:900374