skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Analog signal pre-processing for the Fermilab Main Injector BPM upgrade

Conference · · AIP Conf.Proc.868:517-527,2006
OSTI ID:897289

An analog signal pre-processing scheme was developed, in the framework of the Fermilab Main Injector Beam Position Monitor (BPM) Upgrade, to interface BPM pickup signals to the new digital receiver based read-out system. A key component is the 8-channel electronics module, which uses separate frequency selective gain stages to acquire 53 MHz bunched proton, and 2.5 MHz anti-proton signals. Related hardware includes a filter and combiner box to sum pickup electrode signals in the tunnel. A controller module allows local/remote control of gain settings and activation of gain stages, and supplies test signals. Theory of operation, system overview, and some design details are presented, as well as first beam measurements of the prototype hardware.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
897289
Report Number(s):
FERMILAB-CONF-06-118-AD; TRN: US0701366
Journal Information:
AIP Conf.Proc.868:517-527,2006, Conference: Presented at 12th Beam Instrumentation Workshop (BIW06), Fermilab, Batavia, Illinois, 1-4 May 2006
Country of Publication:
United States
Language:
English

Similar Records

Analog Signal Pre-Processing For The Fermilab Main Injector BPM Upgrade
Journal Article · Mon Nov 20 00:00:00 EST 2006 · AIP Conference Proceedings · OSTI ID:897289

Fermilab Main Injector Beam Position Monitor Upgrade
Conference · Mon May 01 00:00:00 EDT 2006 · AIP Conf.Proc.868:540-548,2006 · OSTI ID:897289

Fermilab Main Injector Beam Position Monitor Upgrade
Journal Article · Mon Nov 20 00:00:00 EST 2006 · AIP Conference Proceedings · OSTI ID:897289