Beam intensity upgrade at Fermilab
The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 897059
- Report Number(s):
- FERMILAB-CONF-06-225-AD; TRN: US0701006
- Resource Relation:
- Conference: Presented at 39th ICFA Advanced Beam Dynamics Workshop on High Intensity High Bightness Hadron Beams 2006 (HB2006), Tsukuba, Japan, 29 May - 2 Jun 2006
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fermilab Recycler Collimation System Design
Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab