skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: P2 performance measurement tools workbook: Draft

Technical Report ·
DOI:https://doi.org/10.2172/83778· OSTI ID:83778

The underlying purpose of the Department of Energy`s (DOE) Waste Minimization and Pollution Prevention (WMin/P2) Program is compliance with the waste management regulations set forth by the DOE, the federal government, and individual state and local agencies 1. In addition to these regulatory mandates, the increases in waste management costs and public interest in environmental issues have created other drivers to develop and demonstrate an effective WMin/P2 Program. The Waste Minimization Division (EM-334) must have adequate methods to calculate and roll up pollution prevention (P2) progress to meet the WMin/P2 requirements; these requirements support DOE and national objectives and direct funding. This document outlines a system to evaluate DOE`s P2 progress towards the waste reduction requirements. The emphasis of these pollution prevention measurements is to evaluate whether P2 activities are effective, (i.e., has the required amount of waste been reduced as a result of the P2 activities) and to evaluate the cost management of P2 projects. The performance evaluation system presented in this document encompass these aspects: (1) site requirements that apply to all DOE waste generating organizations, (2) a baseline that is not affected by short-term waste generation, and (3) key indicators that can be rolled up across DOE sites and across specific Cognizant Secretarial Officers` (CSO) sites. In a performance-based management system, requirements are the fundamental link between the planning and measurement process. The site requirements are {open_quotes}targets{close_quotes} at the process or activity level. Measuring DOE`s P2 progress toward these requirements provides the necessary feedback to (1) compare performance with the requirements/standards (i.e., whether the reduction requirement of 50% by 1999 is achievable) (2) detect departures from planned levels of performance, and (3) restore performance to the planned levels or achieve new levels of performance.

Research Organization:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
83778
Report Number(s):
SAND-95-8615C; ON: DE95014354; TRN: 95:005233
Resource Relation:
Other Information: PBD: Jun 1995
Country of Publication:
United States
Language:
English