skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-192- Ashe-Hanford/Scooteney-Tap

Technical Report ·
DOI:https://doi.org/10.2172/828081· OSTI ID:828081
 [1]
  1. Bonneville Power Administration (BPA), Portland, OR (United States)

Vegetation Management for the Ashe-Hanford (tower 13/1 to 15/2) and Scooteney Tap (tower 2/1+1200 to 4/1+50) line corridor. The Ashe-Hanford line is a 500 kV single circuit transmission line having an easement width of 350 feet. The Scooteney Tap line is a 230 kV single circuit line having an easement width of 262.5 feet on the Department of Energy’s Hanford Nuclear Reservation (Reservation) and an easement width of 100 feet on private lands. The proposed work will be accomplished in the indicated sections of the transmission lines as referenced on the attached checklist. The work will include the performance of tower pad maintenance and access road maintenance in the referenced areas. Maintenance will include the control of all brush species within 30 feet of transmission structures and controlling all vegetation, except grass along the access roads to provide a 14-foot width for travel. Noxious weed management will also occur on the rights-of- way where needed.

Research Organization:
Bonneville Power Administration (BPA), Portland, OR (United States)
Sponsoring Organization:
USDOE Office of NEPA Policy and Assistance (EH-42)
OSTI ID:
828081
Report Number(s):
DOE/EIS-0285/SA-192
Country of Publication:
United States
Language:
English