GENERAL REQUIREMENTS FOR SIMULATION MODELS IN WASTE MANAGEMENT
Most waste management activities are decided upon and carried out in a public or semi-public arena, typically involving the waste management organization, one or more regulators, and often other stakeholders and members of the public. In these environments, simulation modeling can be a powerful tool in reaching a consensus on the best path forward, but only if the models that are developed are understood and accepted by all of the parties involved. These requirements for understanding and acceptance of the models constrain the appropriate software and model development procedures that are employed. This paper discusses requirements for both simulation software and for the models that are developed using the software. Requirements for the software include transparency, accessibility, flexibility, extensibility, quality assurance, ability to do discrete and/or continuous simulation, and efficiency. Requirements for the models that are developed include traceability, transparency, credibility/validity, and quality control. The paper discusses these requirements with specific reference to the requirements for performance assessment models that are used for predicting the long-term safety of waste disposal facilities, such as the proposed Yucca Mountain repository.
- Research Organization:
- Golder Associates Inc, 200 - 18300 Union Hill Road NE, Redmond, WA 98052 (US)
- Sponsoring Organization:
- US Department of Energy (US)
- OSTI ID:
- 827428
- Resource Relation:
- Conference: Waste Management 2003 Symposium, Tucson, AZ (US), 02/23/2003--02/27/2003; Other Information: PBD: 27 Feb 2003
- Country of Publication:
- United States
- Language:
- English
Similar Records
Initial Process and Expected Outcomes for Preliminary Identification of Routes to Yucca Mountain, Nevada
Building and Running the Yucca Mountain Total System Performance Model in a Quality Environment