Title: SPEAR3 DC MAGNET POWER SUPPLIES - AN OVERVIEW

Technical Report ·
DOI:https://doi.org/10.2172/826808· OSTI ID:826808

The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR 3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003. This paper presents an overview and descriptions of the DC magnet power supplies. These consist of tightly-regulated ({le} 10 ppm) current sources ranging in output from 30 A to 800 A and output power ranging from a few watts to almost 1.0 MW. A total of 226 magnet power supplies are in successful operation. The SPEAR 3 upgrade performance and reliability requirements mandated new power supplies for both the SPEAR 3 storage ring, and for the booster-to-SPEAR 3 (BTS) transport line. A large variety of precise, highly stable current power supplies were needed to fill the diverse magnet needs. Also described are outside procurement aspects, in-house construction, installation, testing, performance and operation of the power supplies. During field testing, special emphasis was made to ensure a critically damped response on the current loop. Frequency spectra measurements were made for reference and future diagnostics.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Science (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
826808
Report Number(s):
SLAC-PUB-10383; TRN: US0404215
Resource Relation:
Other Information: PBD: 25 Mar 2004
Country of Publication:
United States
Language:
English

Similar Records

SPEAR3 INTERMEDIATE DC MAGNET POWER SUPPLIES
Technical Report · Wed Jun 23 00:00:00 EDT 2004 · OSTI ID:826808

SPEAR3 LARGE DC MAGNET POWER SUPPLIES
Technical Report · Wed Jun 23 00:00:00 EDT 2004 · OSTI ID:826808

SPEAR 3 Design Report
Technical Report · Mon Dec 02 00:00:00 EST 2002 · OSTI ID:826808