Title: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1

Technical Report ·
DOI:https://doi.org/10.2172/824755· OSTI ID:824755
 [1]
  1. Bonneville Power Administration (BPA), Portland, OR (United States)

Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 30 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See Section 1 of the attached checklist for a complete description of the proposal.

Research Organization:
Bonneville Power Administration (BPA), Portland, OR (United States)
Sponsoring Organization:
USDOE Office of NEPA Policy and Assistance (EH-42)
OSTI ID:
824755
Report Number(s):
DOE/EIS-0285/SA-105
Country of Publication:
United States
Language:
English