21st Century Locomotive Technology: Quarterly Technical Status Report 5 DOE/AL68284-TSR05
The integration of the common rail injection facility with the single cylinder test facility is in progress. Injection modeling parameters wereimproved. Turbocharger experimental data was analyzed and the turbocharger inspected after full load testing. Automatic seal coat spray techniques were developed and several material compositions were tested as coupons and on representative parts. A downselect was made from hybrid energy storage vendor studies. Further development of battery state algorithms was done, and a test plan developed for locomotive demonstration of advanced energy management algorithms. Trip optimization software platform was integrated and baseline validation is in progress. Hybrid energy storage modules have been integrated into the system model.
- Research Organization:
- General Electric Global Research, Niskayuna NY
- Sponsoring Organization:
- USDOE Office of Energy Efficiency and Renewable Energy (EE)
- DOE Contract Number:
- FC04-02AL68284
- OSTI ID:
- 823612
- Report Number(s):
- DOE_AL68284_TSR05
- Country of Publication:
- United States
- Language:
- English
Similar Records
21st Century Locomotive Technology: Quarterly Technical Status Report 6 DOE/AL68284-TSR06
21st Century Locomotive Technology: Quarterly Technical Status Report 8 DOE/AL68284-TSR08