Environmental Assessment and Finding of No Significant Impact: Wind Energy Center Edgeley/Kulm Project, North Dakota
The proposed Edgeley/Kulm Project is a 21-megawatt (MW) wind generation project proposed by Florida Power and Light (FPL) Energy North Dakota Wind LLC (Dakota Wind) and Basin Electric Power Cooperative (Basin). The proposed windfarm would be located in La Moure County, south central North Dakota, near the rural farming communities of Kulm and Edgeley. The proposed windfarm is scheduled to be operational by the end of 2003. Dakota Wind and other project proponents are seeking to develop the proposed Edgeley/Kulm Project to provide utilities and, ultimately, electric energy consumers with electricity from a renewable energy source at the lowest possible cost. A new 115-kilovolt (kV) transmission line would be built to transmit power generated by the proposed windfarm to an existing US Department of Energy Western Area Power Administration (Western) substation located near Edgeley. The proposed interconnection would require modifying Western's Edgeley Substation. Modifying the Edgeley Substation is a Federal proposed action that requires Western to review the substation modification and the proposed windfarm project for compliance with Section 102(2) of the National Environmental Policy Act (NEPA) of 1969, 42 U.S.C. 4332, and Department of Energy NEPA Implementing Procedures (10 CFR Part 1021). Western is the lead Federal agency for preparation of this Environmental Assessment (EA). The US Fish and Wildlife Service (USFWS) is a cooperating agency with Western in preparing the EA. This document follows regulation issued by the Council on Environmental Quality (CEQ) for implementing procedural provisions of NEPA (40 CFR 1500-1508), and is intended to disclose potential impacts on the quality of the human environment resulting from the proposed project. If potential impacts are determined to be significant, preparation of an Environmental Impact Statement would be required. If impacts are determined to be insignificant, Western would complete a Finding of No Significant Impact (FONSI). Environmental protection measures that would be included in the design of the proposed project are included.
- Research Organization:
- U.S. Department of Energy, Western Area Power Administration (US)
- Sponsoring Organization:
- USDOE Office of NEPA Policy and Assistance (EH-42) (US)
- OSTI ID:
- 823431
- Report Number(s):
- DOE/EA-1465; TRN: US200427%%622
- Resource Relation:
- Other Information: PBD: 15 Apr 2003
- Country of Publication:
- United States
- Language:
- English
Similar Records
Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement
Kiowa Creek Switching Station
Related Subjects
POLICY AND ECONOMY
24 POWER TRANSMISSION AND DISTRIBUTION
COMMUNITIES
COMPLIANCE
ELECTRIC POWER
ELECTRICITY
ENVIRONMENTAL IMPACT STATEMENTS
MODIFICATIONS
POWER TRANSMISSION LINES
REGULATIONS
RENEWABLE ENERGY SOURCES
US CEQ
US FWS
US NATIONAL ENVIRONMENTAL POLICY ACT
WESTERN AREA POWER ADMINISTRATION
EA
WAPA
WIND ENERGY
ND
EDGELEY
FLORIDA POWER AND LIGHT
FPL
ENERGY NORTH DAKOTA WIND LLC
DAKOTA WIND
BASIN ELECTRIC POWER COOPERATIVE
BASIN