Determination of C0-60 in Cobalt Slugs and Slabs and Radionuclides in Curium Sampler Slugs L-Reactor Disassembly Basin
Co-60 was historically produced in the SRS reactors. Cobalt slugs were irradiated in the early 1970s. Post-production, remaining cobalt slugs (including slab form) were consolidated for storage. There are approximately nine hundred cobalt slugs currently stored awaiting final disposition. These slugs had historically incomplete documentation for activity rates; therefore, assaying was required in order to determine their activity levels. Since the gamma dose rate from these slugs is extremely high, the most cost effective way to shield a source of this magnitude from personnel and the radiation detector was to use the basin water in which the slugs are stored as the shield. A sodium iodide gamma detector was placed above a specially designed air collimator assembly, so that slug was at least eight feet from the detector and was shielded by the basin water. Using a sodium iodide detector and multichannel analyzer system and an underwater collimator assembly, Co-60 concentrations we re determined for Disassembly Basin cobalt slugs and slabs and 18 curium sampler slugs. The total activity of all of the assayed slugs summed to 31,783 curies. From the Co-60 concentrations of the curium sampler slugs, the irradiation flux was determined for the known irradiation time. The amounts of Pu-238, 239, 240, 241, 242; Am-241, 243; and Cm-242, 244 produced were then obtained based on the original amount of Pu-239 irradiated.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC09-96SR18500
- OSTI ID:
- 821125
- Report Number(s):
- WSRC-TR-2003-00444; TRN: US0400640
- Resource Relation:
- Other Information: PBD: 23 Jan 2004
- Country of Publication:
- United States
- Language:
- English
Similar Records
HOLDUP MEASUREMENTS FOR VISUAL EXAMINATION GLOVEBOXES AT THE SAVANNAH RIVER SITE
SNAP PROGRAMS. Quarterly Progress Report No. 3 for April 1 through June 30, 1960