CH Packaging Operations for High Wattage Waste at LANL
Abstract
This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.
- Authors:
- Publication Date:
- Research Org.:
- Waste Isolation Pilot Plant, Carlsbad, NM (US)
- Sponsoring Org.:
- US Department of Energy (US)
- OSTI Identifier:
- 815193
- Report Number(s):
- DOE/WIPP 02-3220, Rev. 1
TRN: US0305230
- DOE Contract Number:
- 04-01A66444
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 18 Dec 2002
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; GASKETS; HELIUM; LANL; PACKAGING; MANUALS; CONTAINERS; ALPHA-BEARING WASTES; SEALS; LEAK TESTING
Citation Formats
Solutions LLC, Washington TRU. CH Packaging Operations for High Wattage Waste at LANL. United States: N. p., 2002.
Web. doi:10.2172/815193.
Solutions LLC, Washington TRU. CH Packaging Operations for High Wattage Waste at LANL. United States. https://doi.org/10.2172/815193
Solutions LLC, Washington TRU. 2002.
"CH Packaging Operations for High Wattage Waste at LANL". United States. https://doi.org/10.2172/815193. https://www.osti.gov/servlets/purl/815193.
@article{osti_815193,
title = {CH Packaging Operations for High Wattage Waste at LANL},
author = {Solutions LLC, Washington TRU},
abstractNote = {This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.},
doi = {10.2172/815193},
url = {https://www.osti.gov/biblio/815193},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Dec 18 00:00:00 EST 2002},
month = {Wed Dec 18 00:00:00 EST 2002}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.