skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cold Testing of a Russian Pulsating Mixer Pump at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

Technical Report ·
DOI:https://doi.org/10.2172/814116· OSTI ID:814116

Russian pulsating mixer pump (PMP) technology was identified in FY 1996 during technical exchanges between the U.S. Department of Energy (DOE) Tanks Focus Area Retrieval and Closure program, the DOE Environmental Management International Programs, and delegates from Russia as a technology that could be implemented in tank waste retrieval operations in the United States. The PMP is basically a jet mixer powered by a pressure/vacuum supply system. A prototype PMP was provided by the Russian Mining and Chemical Combine and evaluated as a potential retrieval tool in FY 1997 at Pacific Northwest National Laboratory (PNNL). Based on this evaluation, Oak Ridge National Laboratory (ORNL) and DOE staff determined that a modified PMP would meet project needs for bulk mobilization of sludge from one or more of the Gunite and Associated Tanks (GAAT) at ORNL. In FY 1998, PMP technology was selected for deployment in one of the GAAT to mobilize settled solids. Deployment of the PMP was expected to reduce operation and maintenance costs required to utilize more expensive retrieval systems. The following series of cold tests and inspections were conducted on one of the three PMP units provided to verify the acceptability and readiness of the mixing system for operation in the GAATs at ORNL: (1) Inspections and measurements designed to evaluate the integrity of the equipment: Fabrication shop inspections, Equipment inspections, Vibration/oscillation measurements, Hydrostatic pressure tests. (2) Functionality of the system components: Tank riser interface functionality, Decontamination spray ring (DSR) functionality, Valves, actuator, sensors, and control system functionality, Support fixture tests; and Contamination control assessment. (3) Mixing and operational performance of the PMP system: DSR performance, PMP debris tolerance, PMP performance with water only, PMP cleaning radius determination, and PMP performance with sludge surrogates. The results from these tests indicate that the PMP should be successful in mixing materials with characteristics similar to sand, kaolin clay, and gravel at moderate operating pressure in a 20-ft-diam tank similar to the GAAT TH-4. Minimum cleaning radii in the range of {approx}5.5 to {approx}8 ft were observed. After various control system modifications and improvements, the PMP was successfully operated for several hours in the presence of both floating and submerged debris and various waste surrogates. After completion of cold testing, the system was successfully deployed in Gunite tank TH-4 in FY 2001.

Research Organization:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC05-00OR22725
OSTI ID:
814116
Report Number(s):
ORNL/TM-2001/141; TRN: US0303995
Resource Relation:
Other Information: PBD: 29 Jan 2002
Country of Publication:
United States
Language:
English