Title: Repackaging of Two Bulged Crimp Sealed Cans Containing Plutonium Bearing Materials

Conference ·

Two cans containing plutonium bearing materials were found during radiography surveillance activities to be bulged. The cans had been stored in DOT 6M shipping containers at the Savannah River Site. The material in the first can (Item CZA96-179) was packaged can/bag/can configuration with the inner and outer cans being crimp sealed. The crimp sealed innermost can was clearly deformed from the radiography picture taken for surveillance purposes. This material had been stored in the shipping container since the mid 1970s. The second can (Item 50014440) contained plutonium bearing material of a different origin. The material had been repackaged at the Savannah River Site in the mid 1990's, and the repackaged can was stored in a 6M shipping drum. A special puncturing tool, which secured the can and allowed for a very controlled puncture of both outer and inner cans was used in a glovebox. The glovebox has a dry air system and an argon supply. The puncturing tool utilized a non-sparking punch and an argon purge. The cans were repackaged into filtered outer cans. A description of the puncturing tool, repackaging activities, and of the materials will be provided.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
810560
Report Number(s):
WSRC-MS-2003-00277; TRN: US0302786
Resource Relation:
Journal Volume: 2003; Conference: 2003 ASME Pressure Vessel and Piping Conference, Cleveland, OH (US), 07/20/2003--07/24/2003; Other Information: PBD: 29 Apr 2003
Country of Publication:
United States
Language:
English