Title: Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.

Technical Report ·
DOI:https://doi.org/10.2172/803579· OSTI ID:803579
;  [1]
  1. Shoshone-Paiute Tribes of the Duck Valley Reservation. Dept. of Habitat, Parks, Fish and Game.

Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation of boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.

Research Organization:
Bonneville Power Administration, Portland, OR (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
00004826
OSTI ID:
803579
Report Number(s):
DOE/BP-00004826-1; TRN: US200302%%291
Resource Relation:
Other Information: PBD: 1 Jan 2002