Report on the TESLA Engineering Study/Review
In March, 2001, the TESLA Collaboration published its Technical Design Report (TDR, see references and links in Appendix), the first sentence of which stated ''...TESLA (TeV-Energy Superconducting Linear Collider) (will be) a superconducting electron-positron collider of initially 500 GeV total energy, extendable to 800 GeV, and an integrated X-ray laser laboratory.'' The TDR included cost and manpower estimates for a 500 GeV e{sup +}e{sup -} collider (250 on 250 GeV) based on superconducting RF cavity technology. This was submitted as a proposal to the German government. The government asked the German Science Council to evaluate this proposal. The recommendation from this body is anticipated to be available by November 2002. The government has indicated that it will react on this recommendation by mid-2003. In June 2001, Steve Holmes, Fermilab's Associate Director for Accelerators, commissioned Helen Edwards and Peter Garbincius to organize a study of the TESLA Technical Design Report and the associated cost and manpower estimates. Since the elements and methodology used in producing the TESLA cost estimate were somewhat different from those used in preparing similar estimates for projects within the U.S., it is important to understand the similarities, differences, and equivalences between the TESLA estimate and U.S. cost estimates. In particular, the project cost estimate includes only purchased equipment, materials, and services, but not manpower from DESY or other TESLA collaborating institutions, which is listed separately. It does not include the R&D on the TESLA Test Facility (TTF) nor the costs of preparing the TDR nor the costs of performing the conceptual studies so far. The manpower for the pre-operations commissioning program (up to beam) is included in the estimate, but not the electrical power or liquid Nitrogen (for initial cooldown of the cryogenics plant). There is no inclusion of any contingency or management reserve. If the U.S. were to become involved with the TESLA project, either as a collaborator for an LC in Germany, or as host country for TESLA in the U.S., it is important to begin to understand the scope and technical details of the project, what R&D still needs to be done, and how the U.S. can contribute. The charge for this study is included in the Appendix to this report.
- Research Organization:
- SLAC National Accelerator Lab., Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE Office of Science (US)
- DOE Contract Number:
- AC03-76SF00515
- OSTI ID:
- 801801
- Report Number(s):
- SLAC-PUB-9487; TRN: US0204757
- Resource Relation:
- Other Information: PBD: 30 Aug 2002
- Country of Publication:
- United States
- Language:
- English
Similar Records
Technical challenges of superconductivity and cryogenics in pursuing TESLA-TTF
SUMMARY OF THE RF TECHNOLOGY WORKING GROUP (T3).