skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.

Conference ·
OSTI ID:798551

During the RHIC 2001-2 run, the beam position monitor (BPM) system provided independent average orbit and turn-by-turn (TBT) position measurements at 162 locations in each measurement plane and RHIC ring. TBT acquisition was successfully upgraded from 128 turns to 1024 turns per trigger, including injection. Closed orbits were acquired and automatically archived every two seconds through each acceleration ramp for orbit analysis and feed-forward orbit correction. This paper presents the overall system performance during this run, including precision, reproducibility, radiation damage, and analysis tools. We also summarize future plans, including million-turn TBT acquisition for nonlinear dynamics studies.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
798551
Report Number(s):
BNL-68941; R&D Project: AD003; KA0202011; TRN: US0204840
Resource Relation:
Conference: 2002 EUROPEAN PARTICLE ACCELERATOR CONFERENCE, PARIS (FR), 06/02/2002--06/07/2002; Other Information: PBD: 2 Jun 2002
Country of Publication:
United States
Language:
English

Similar Records

RHIC BPM SYSTEM MODIFICATIONS AND PERFORMANCE.
Conference · Mon May 16 00:00:00 EDT 2005 · OSTI ID:798551

MULTI - MILLION - TURN BEAM POSITION MONITORS FOR RHIC.
Conference · Mon May 12 00:00:00 EDT 2003 · OSTI ID:798551

COUPLING MEASUREMENT AND CORRECTION AT RHIC.
Conference · Sun Jun 02 00:00:00 EDT 2002 · OSTI ID:798551