skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: ACCELERATOR PHYSICS MODEL OF EXPECTED BEAM LOSS ALONG THE SNS ACCELERATOR FACILITY DURING NORMAL OPERATION.

Conference ·
OSTI ID:798209

The most demanding requirement in the design of the SNS accelerator chain is to keep the accelerator complex under hands-on maintenance. This requirement implies a hard limit for residual radiation below 100 mrem/hr at one feet from the vacuum pipe and four hours after shutdown for hundred days of normal operation. It has been shown by measurements as well as simulation [l] that this limit corresponds to 1-2 Watts/meter average beam losses. This loss level is achievable all around the machine except in specific areas where remote handling will be necessary. These areas have been identified and correspond to collimation sections and dumps where a larger amount of controlled beam loss is foreseen. Even if the average level of loss is kept under 1 W/m, there are circumstances under which transient losses occur in the machine. The prompt radiation or potential damage in the accelerator components can not be deduced from an average beam loss of 1 W/m. At the same time, controlled loss areas require a dedicated study to clarify the magnitude and distribution of the beam loss. From the front end to the target, we have estimated the most probable locations for transient losses and given an estimate of their magnitude and frequency. This information is essential to calculate the necessary shielding or determine the safety procedures during machine operation. Losses in controlled areas, and the cleaning systems are the subject of Section 2. The inefficiency of each system will be taken into account for the discussion on Section 3 where n controlled loss is estimated. Section 4 summarizes our findings and presents a global view of the losses along the accelerator chain.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
DOE/SC (US)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
798209
Report Number(s):
BNL-69262; R&D Project: 86401; 39KC0200; TRN: US0203961
Resource Relation:
Conference: 8TH EUROPEAN PARTICLE ACCELERATOR CONFERENCE, PARIS (FR), 06/03/2002--06/07/2002; Other Information: PBD: 3 Jun 2002
Country of Publication:
United States
Language:
English