Report on the TESLA engineering study/review
A team from Argonne National Lab, Cornell, Fermilab, Jefferson Lab, and SLAC has studied the TESLA TDR and its associated cost and manpower estimates, concentrating on the five largest cost sub-systems (Main Linac Modules, Main Linac RF Systems, Civil Engineering, Machine Infrastructure, and XFEL Incremental). These elements were concerned mainly with providing energy reach. We did not study the lower cost, but still technically challenging elements providing luminosity and physics capability, namely damping rings, beam delivery system, beam injection system, positron production, polarized beams, etc. The study did not attempt to validate the TDR cost estimates, but rather its purpose was to understand the technology and status of the large cost items, and the methodology by which their estimated cost was determined. In addition, topics of project oversight were studied.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 797143
- Report Number(s):
- FERMILAB-TM-2179; TRN: US0204004
- Resource Relation:
- Other Information: PBD: 18 Jul 2002
- Country of Publication:
- United States
- Language:
- English
Similar Records
ILC Reference Design Report: Accelerator Executive Summary
Fundamental Power Coupler Technical Development - Final CRADA Report