skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: LANMAS Gap Analysis Report

Abstract

In July, 2000, the Controlled Materials Accountability and Tracking System (COMATS) Team, with the assistance of a representative of the Local Area Network Materials Accountability System (LANMAS) development team from Savannah River, performed an evaluation to enumerate and qualify differences between the current LANMAS functionality and LLNL requirements as implemented by COMATS. The differences found range from minor to serious deficiencies of LANMAS in relation to current LLNL MC&A practice. Therefore, we recommend a gradual integration of LANMAS into a hybrid system which uses LANMAS to satisfy DOE/NNSA MC&A and reporting requirements and uses COMATS to satisfy LLNL-specific MC&A and operational requirements.

Authors:
; ; ; ;
Publication Date:
Research Org.:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Org.:
USDOE Office of Defense Programs (DP) (US)
OSTI Identifier:
793695
Report Number(s):
UCRL-ID-140222
TRN: US200218%%43
DOE Contract Number:  
W-7405-Eng-48
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 25 Aug 2000
Country of Publication:
United States
Language:
English
Subject:
99 GENERAL AND MISCELLANEOUS//MATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; EVALUATION; HYBRID SYSTEMS; LOCAL AREA NETWORKS; REPORTING REQUIREMENTS

Citation Formats

Parrish, C, Yee, W, Okuda, V, Watson, B, and Storch, N. LANMAS Gap Analysis Report. United States: N. p., 2000. Web. doi:10.2172/793695.
Parrish, C, Yee, W, Okuda, V, Watson, B, & Storch, N. LANMAS Gap Analysis Report. United States. https://doi.org/10.2172/793695
Parrish, C, Yee, W, Okuda, V, Watson, B, and Storch, N. 2000. "LANMAS Gap Analysis Report". United States. https://doi.org/10.2172/793695. https://www.osti.gov/servlets/purl/793695.
@article{osti_793695,
title = {LANMAS Gap Analysis Report},
author = {Parrish, C and Yee, W and Okuda, V and Watson, B and Storch, N},
abstractNote = {In July, 2000, the Controlled Materials Accountability and Tracking System (COMATS) Team, with the assistance of a representative of the Local Area Network Materials Accountability System (LANMAS) development team from Savannah River, performed an evaluation to enumerate and qualify differences between the current LANMAS functionality and LLNL requirements as implemented by COMATS. The differences found range from minor to serious deficiencies of LANMAS in relation to current LLNL MC&A practice. Therefore, we recommend a gradual integration of LANMAS into a hybrid system which uses LANMAS to satisfy DOE/NNSA MC&A and reporting requirements and uses COMATS to satisfy LLNL-specific MC&A and operational requirements.},
doi = {10.2172/793695},
url = {https://www.osti.gov/biblio/793695}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Aug 25 00:00:00 EDT 2000},
month = {Fri Aug 25 00:00:00 EDT 2000}
}