skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: 62-TeV center of mass hadron collider with superbunch beams

Conference ·
OSTI ID:788267

The scheme of a 62-TeV center of mass p-p collider with superbunch beams at Fermilab is proposed as a practical and realistically achievable future project. It will be built in two stages, using the same tunnel, first with a 2 Tesla low field magnet collider ring and later with a 10 Tesla high field magnet collider ring. Both low and high field magnets have twin bore aperture and will be installed in the tunnel with the circumference of 87.25 km. In each bore a proton beam is accelerated, using induction cavities to increase luminosity. In the first stage they install a 7 TeV accelerator ring with operating field of 2 Tesla, based on the superferric transmission-line design. This ring will be operated at a 14-TeV center of mass collider. This will have the same energy as the LHC, but it will have 15 times higher luminosity, namely 1.5 x 10{sup 35}/cm{sup 2}/sec. The estimated synchrotron radiation is negligible with this machine. The existing Fermilab accelerator system, including the 150 GeV main injector, will be used as the injector system. Its rough cost estimation and schedule for this first stage are presented. In the second stage proton beams are accelerated, also using induction cavities up to 31 TeV with the 10 Tesla dipole magnets. The counter circulating beams will collide with the 62-TeV center of mass energy. With the superbunch beams they can expect the luminosity can be increased about 15 times more than the conventional method with RF cavities. It will be 10{sup 35}/cm{sup 2}/sec. In the second stage, the synchrotron radiation power will be about 12 W/m, and they need an elaborated beam screen.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
788267
Report Number(s):
FERMILAB-Conf-01/313-E; TRN: US0110862
Resource Relation:
Conference: Snowmass 2001, Snowmass, CO (US), 07/01/2001--07/20/2001; Other Information: PBD: 5 Nov 2001
Country of Publication:
United States
Language:
English

Similar Records

62-TeV center of mass hadron collider with capability for super bunch beams
Conference · Wed Aug 22 00:00:00 EDT 2001 · OSTI ID:788267

Design study for a staged Very Large Hadron Collider
Technical Report · Tue Jun 26 00:00:00 EDT 2001 · OSTI ID:788267

A 233 km tunnel for lepton and hadron colliders
Journal Article · Fri Dec 21 00:00:00 EST 2012 · AIP Conference Proceedings · OSTI ID:788267