Title: Near-Term Research and Testing of the CWE-300: Executive Summary of Project Final Report

Technical Report ·
DOI:https://doi.org/10.2172/763305· OSTI ID:763305

This report is a summary of activity on this subcontract during the period from September 1, 1997 through August 30, 1999. The contract entailed the engineering, component tests, system field tests, certification, and preparation for manufacturing the existing Cannon Wind Eagle 300-kW (CWE-300) wind turbine. The CWE 300 is a lightweight, flexible machine with a number of innovative design features that, relative to comparable rigid-hub machines, promises to contribute to reduced capital, installation, and maintenance costs. The architecture of the CWE-300 evolved from earlier wind turbine models developed over several decades. The current design retains many of the desirable features of earlier machines, addresses problems exhibited by those machines, and incorporates further innovative design features.

Research Organization:
National Renewable Energy Lab. (NREL), Golden, CO (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC36-99GO10337
OSTI ID:
763305
Report Number(s):
NREL/SR-500-27475; TRN: AH200033%%145
Resource Relation:
Other Information: PBD: 24 Aug 2000