skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Survey techniques developed to align stacked beamlines at CEBAF

Journal Article ·
OSTI ID:756862

The Continuous Electron Beam Accelerator Facility (CEBAF) in Newport News, Virginia is a new accelerator designed to produce 4 GeV 200 micro-amp continuous wave beams for nuclear physics research. It consists of two superconducting linacs each accelerating electrons by 400 MeV and linked by arcs allowing five pass recirculation. These linacs form the straight sections in a racetrack shaped accelerator contained in over 1.3 km of tunnel. The beam lines will consist of 42 superconducting accelerating cryomodules (in the linacs only), over 400 dipoles, 650 quadrupoles, and 100 sextupoles, most of the which are concentrated in the two arc sections of the machine. It is here that the single beam fine from the linacs is split into five beams of offering energy and transported to the opposite linac where it is recombined into a single beam to again pass through a linac and receive additional acceleration. These recirculation arcs are designed to maintain beam quality through a lattice which is achromatic, isochronous and whose length is equal to a multiple number of RF wavelengths. The short term relative alignment tolerances coupled with the beam fine design reflect the beam quality issues while absolute positioning determines the range of adjustment needed to match the RF phase in the linac segments. The alignment techniques which use a monumented control network as a reference, are designed to position stacked magnets and their support systems to these tolerances. Specialized procedures were tailored from existing hardware and software systems to address each phase or step of the alignment process. This allowed a relatively rapid expansion of alignment services at a new laboratory where surveying support was not seriously addressed until more then one third of the enclosure had been built.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
756862
Report Number(s):
CEBAF-PR-94-002; DOE/ER/40150-1640; TRN: AH200021%%224
Resource Relation:
Other Information: No journal information given for this preprint; PBD: 1 Jan 1994
Country of Publication:
United States
Language:
English

Similar Records

Survey techniques developed to align stacked beamlines at CEBAF
Technical Report · Fri Apr 01 00:00:00 EST 1994 · OSTI ID:756862

CEBAF progress report
Technical Report · Mon Jan 01 00:00:00 EST 1990 · OSTI ID:756862

Report on CEBAF
Conference · Sat Jun 20 00:00:00 EDT 1992 · OSTI ID:756862