1998 Comprehensive TNX Area Annual Groundwater and Effectiveness Monitoring Report
Abstract
Shallow groundwater beneath the TNX Area at the Savannah River Site has been contaminated with chlorinated volatile organic compounds such as trichloroethylene and carbon tetrachloride. The Interim Action T-1 Air Stripper System began operation on September 16, 1996. A comprehensive groundwater monitoring program was initiated to measure the effectiveness of the system. The Interim Action is meeting its objectives and is capable of continuing to do so until the final groundwater remedial action is in place.
- Authors:
- Publication Date:
- Research Org.:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Org.:
- USDOE
- OSTI Identifier:
- 7562
- Report Number(s):
- WSRC-RP-99-4003
ON: DE00007562
- DOE Contract Number:
- AC09-96SR18500
- Resource Type:
- Technical Report
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 54 ENVIRONMENTAL SCIENCES; Savannah River Plant; Ground Water; Monitoring
Citation Formats
Chase, J. 1998 Comprehensive TNX Area Annual Groundwater and Effectiveness Monitoring Report. United States: N. p., 1999.
Web. doi:10.2172/7562.
Chase, J. 1998 Comprehensive TNX Area Annual Groundwater and Effectiveness Monitoring Report. United States. https://doi.org/10.2172/7562
Chase, J. 1999.
"1998 Comprehensive TNX Area Annual Groundwater and Effectiveness Monitoring Report". United States. https://doi.org/10.2172/7562. https://www.osti.gov/servlets/purl/7562.
@article{osti_7562,
title = {1998 Comprehensive TNX Area Annual Groundwater and Effectiveness Monitoring Report},
author = {Chase, J},
abstractNote = {Shallow groundwater beneath the TNX Area at the Savannah River Site has been contaminated with chlorinated volatile organic compounds such as trichloroethylene and carbon tetrachloride. The Interim Action T-1 Air Stripper System began operation on September 16, 1996. A comprehensive groundwater monitoring program was initiated to measure the effectiveness of the system. The Interim Action is meeting its objectives and is capable of continuing to do so until the final groundwater remedial action is in place.},
doi = {10.2172/7562},
url = {https://www.osti.gov/biblio/7562},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jun 02 00:00:00 EDT 1999},
month = {Wed Jun 02 00:00:00 EDT 1999}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.