Title: Relaxation of the lower frit loading constraint for DWPF process control

Technical Report ·
DOI:https://doi.org/10.2172/752022· OSTI ID:752022

The lower limit on the frit loading parameter when measurement uncertainty is introduced has impacted DWPF performance during immobilization of Tank 42 Sludge; therefore, any defensible relaxation or omission of this constraint should correspondingly increase DWPF waste loading and efficiency. Waste loading should be increased because the addition of frit is the current remedy for exceeding the lower frit loading constraint. For example, frit was added to DWPF SME Batches 94, 97 and 98 to remedy these batches for low frit loading. Attempts were also made to add frit in addition to the optimum computed to assure the lower frit loading constraint would be satisfied; however, approximately half of the SME Batches produced after Batch 98 have violated the lower frit loading constraint. If the DWPF batches did not have to be remediated and additional frit added because of the lower frit loading limit, then both, the performance of the DWPF process and the waste loading in the glass produced would be increased. Before determining whether or not the lower frit loading limit can be relaxed or omitted, the origin of this and the other constraints related to durability prediction must be examined. The lower limit loading constraint results from the need to make highly durable glass in DWPF. It is required that DWPF demonstrate that the glass produced would have durability that is at least two standard deviations greater than that of the Environmental Assessment (EA) glass. Glass durability cannot be measured in situ, it must be predicted from composition which can be measured. Fortunately, the leaching characteristics of homogeneous waste glasses is strongly related to the total molar free energy of the constituent species. Thus the waste acceptance specification has been translated into a requirement that the total molar free energy associated with the glass composition that would be produced from a DWPF melter feed batch be less than that of the EA glass accounting for both prediction uncertainty (including bias) and measurement uncertainty to a confidence level of 95%. However, it was discovered during Integrated DWPF Melter System (IDMS) testing that under certain conditions, DWPF glasses were prone to phase separation resulting in glasses that had noticeably unpredictable and, at times, unacceptable leaching behavior. This document details an evaluation of the continued applicability of the low frit constraint for DWPF Slurry Mix Evaporator (SME) acceptability determinations.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
752022
Report Number(s):
WSRC-RP-99-00355; TRN: US0002637
Resource Relation:
Other Information: PBD: 1 Mar 2000