Title: Light Duty Utility Arm deployment in Tank WM-188

Technical Report ·
DOI:https://doi.org/10.2172/752006· OSTI ID:752006

The Light Duty Utility Arm (LDUA) was successfully deployed in Tank WM-188 during February and March of 1999 at the Idaho Nuclear Technology and Engineering Center (INTEC) tank farm at the Idaho National Engineering and Environmental Laboratory. Some equipment problems were identified, but most were indicative of any first time activity. Deployment during cold weather imposed additional equipment risks, but in general, equipment response to the winter conditions was better than expected. Three end effectors were demonstrated during the deployment. All performed as expected, although the limited resolution of the Alternating Current Field Measurement end effector cannot absolutely confirm tank integrity, which is necessary for future tank inspections. Four heel samples were taken with the sampler end effector and a broad spectrum of analyses were performed. A detailed inspection of the tank interior was performed with the High Resolution Stereo Video System end effector. The sample information is proving invaluable to the development of new treatment flowsheets and waste forms. It is expected that the LDUA will be deployed for tank inspections through the next several years to support other Notice of Non-Compliance (NON) Consent Order requirements and several other ongoing initiatives.

Research Organization:
Idaho National Lab. (INL), Idaho Falls, ID (United States)
Sponsoring Organization:
USDOE Office of Environmental Management (EM) (US)
DOE Contract Number:
AC07-99ID13727
OSTI ID:
752006
Report Number(s):
INEEL/EXT-99-01302; TRN: US0001107
Resource Relation:
Other Information: PBD: 1 Dec 1999
Country of Publication:
United States
Language:
English