skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Pilot unit testing of scale inhibitors at geopressured energy well sites

Conference ·
OSTI ID:7369473

The skid-mounted pilot unit is a smaller version of the main surface equipment used at geothermal geopressured well sites. It will be used to monitor the effectiveness of scale and corrosion inhibitors for the preventing of scaling and corrosion in the main surface equipment. The pilot unit will model the main surface equipment with respect to pressure, flow velocities, and scale inhibitor injection. The pilot unit will also operate under other conditions for optimization determination. Scaling tendencies will be monitored by specially shaped mild steel coupons placed at critical locations throughout the pilot unit. The coupons will be checked at regular intervals, and analysis will include visual, weight and EDAX-SEM analysis. Various scale inhibitors will be tested over a large range of dosage levels in order to screen inhibitors and their effectiveness for water with particular quality parameters.

OSTI ID:
7369473
Report Number(s):
CONF-811026-70; ON: DE82003311
Resource Relation:
Conference: 5. geopressured-geothermal energy conference, Baton Rouge, LA, USA, 13 Oct 1981; Related Information: In: Geopressured-geothermal energy, US Gulf Coast, by
Country of Publication:
United States
Language:
English