SSC string test facility for superconducting magnets: Testing capabilities and program for collider magnets
Conference
·
OSTI ID:69318
The Accelerator Systems String Test (ASST) R&D Testing Facility has been established at the SSC Laboratory to test Collider and High Energy Booster (HEB) superconducting magnet strings. The facility is operational and has had two testing periods utilizing a half cell of collider prototypical magnets with the associated spool pieces and support systems. This paper presents a description of the testing capabilities of the facility with respect to components and supporting subsystems (cryogenic, power, quench protection, controls and instrumentation), the planned testing program for the collider magnets.
- Research Organization:
- Superconducting Super Collider Lab., Dallas, TX (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC35-89ER40486
- OSTI ID:
- 69318
- Report Number(s):
- SSCL-Preprint-431; CONF-930511-523; ON: DE95011125; TRN: 95:015271
- Resource Relation:
- Conference: PAC `93: international particle accelerator conference, Washington, DC (United States), 17-20 May 1993; Other Information: PBD: May 1993
- Country of Publication:
- United States
- Language:
- English
Similar Records
Full-power test of a string of magnets comprising a half-cell of the Superconducting Super Collider
Cryogenic systems for the SSC and the status of their development
The accelerator systems string test: Objectives, problems, results, anecdotes, and reflections
Technical Report
·
Thu Oct 01 00:00:00 EDT 1992
·
OSTI ID:69318
Cryogenic systems for the SSC and the status of their development
Conference
·
Thu Jul 01 00:00:00 EDT 1993
·
OSTI ID:69318
+1 more
The accelerator systems string test: Objectives, problems, results, anecdotes, and reflections
Conference
·
Thu Apr 01 00:00:00 EST 1993
·
OSTI ID:69318