Field test of ultra-low head hydropower package based on marine thrusters. Final report
Abstract
The project includes the design, fabrication, assembly, installation, and field test of the first full-scale operating hydropower package (turbine, transmission, and generator) based on a design which incorporates a marine-thruster as the hydraulic prime mover. Included here are: the project overview; engineering design; ultra-low head hydropower package fabrication; component procurement, cost control, and scheduling; thruster hydraulic section installation; site modeling and resulting recommended modifications; testing; and baseline environmental conditions at Stone Drop. (MHR)
- Publication Date:
- Research Org.:
- Energy Research and Applications, Inc., Santa Monica, CA (USA)
- OSTI Identifier:
- 6859436
- Report Number(s):
- DOE/ID/12201-T2
ON: DE84013685
- DOE Contract Number:
- FC07-80ID12201
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: Portions are illegible in microfiche products. Original copy available until stock is exhausted
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 13 HYDRO ENERGY; LOW-HEAD HYDROELECTRIC POWER PLANTS; FIELD TESTS; DESIGN; ELECTRIC GENERATORS; FABRICATION; INSTALLATION; POWER TRANSMISSION; TURBINES; HYDROELECTRIC POWER PLANTS; MACHINERY; POWER PLANTS; TESTING; TURBOMACHINERY; 130300* - Hydro Energy- Plant Design & Operation
Citation Formats
. Field test of ultra-low head hydropower package based on marine thrusters. Final report. United States: N. p., 1983.
Web. doi:10.2172/6859436.
. Field test of ultra-low head hydropower package based on marine thrusters. Final report. United States. https://doi.org/10.2172/6859436
. 1983.
"Field test of ultra-low head hydropower package based on marine thrusters. Final report". United States. https://doi.org/10.2172/6859436. https://www.osti.gov/servlets/purl/6859436.
@article{osti_6859436,
title = {Field test of ultra-low head hydropower package based on marine thrusters. Final report},
author = {},
abstractNote = {The project includes the design, fabrication, assembly, installation, and field test of the first full-scale operating hydropower package (turbine, transmission, and generator) based on a design which incorporates a marine-thruster as the hydraulic prime mover. Included here are: the project overview; engineering design; ultra-low head hydropower package fabrication; component procurement, cost control, and scheduling; thruster hydraulic section installation; site modeling and resulting recommended modifications; testing; and baseline environmental conditions at Stone Drop. (MHR)},
doi = {10.2172/6859436},
url = {https://www.osti.gov/biblio/6859436},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Dec 01 00:00:00 EST 1983},
month = {Thu Dec 01 00:00:00 EST 1983}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.