Title: Biological Monitoring Program for East Fork Poplar Creek

Abstract

In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit, a Biologicai Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the compiex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic integritymore » of EFPC, These tasks are (1) toxicity monitoring, (2) biological indicator studies, (3) bioaccumuiation studies, and (4) ecological surveys of the periphyton, benthic macro invertebrate, and fish communities. Monitoring is currently being conducted at five sites, although sites maybe excluded and/or others added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) concentration of mercury in the adjacent floodplain, (5) appropriate habitat distribution, and (6) access. The sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18 and 19), iocated off the ORR and below an area of intensive commercial and limited light industrial development; EFK 13.8 (also EFK 14), located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1 ). Other sampling sites on EFPC are utilized as appropriate for individual tasks. Brushy Fork (BF) at kilometer (BFK) 7.6 is used as a reference stream in most tasks of the BMAP. Additional sites off the ORR are also occasional 1 y used for reference, including Beaver Creek, Bull Run, Hinds Creek, Paint Rock Creek, and the Einory River in Watts Bar Reservoir (Fig. 1.2).« less

Authors:
; ; ; ; ; ; ; ; ; ;
Publication Date:
Research Org.:
Oak Ridge Y-12 Plant (Y-12), Oak Ridge, TN
Sponsoring Org.:
USDOE Office of Defense Programs (DP)
OSTI Identifier:
6822
Report Number(s):
Y/TS-1194 Rev 28
ON: DE00006822
DOE Contract Number:  
AC05-84OR21400
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; Y-12 Plant; Streams; Fishes; Toxicity; Monitoring; Progress Report

Citation Formats

Adams, S M, Christensen, S W, Greeley, jr, M S, Hill, W R, Kszos, L A, McCarthy, J F, Peterson, M J, Ryon, M G, Smith, J G, Southworth, G R, and Stewart, A J. Biological Monitoring Program for East Fork Poplar Creek. United States: N. p., 1998. Web. doi:10.2172/6822.
Adams, S M, Christensen, S W, Greeley, jr, M S, Hill, W R, Kszos, L A, McCarthy, J F, Peterson, M J, Ryon, M G, Smith, J G, Southworth, G R, & Stewart, A J. Biological Monitoring Program for East Fork Poplar Creek. United States. https://doi.org/10.2172/6822
Adams, S M, Christensen, S W, Greeley, jr, M S, Hill, W R, Kszos, L A, McCarthy, J F, Peterson, M J, Ryon, M G, Smith, J G, Southworth, G R, and Stewart, A J. 1998. "Biological Monitoring Program for East Fork Poplar Creek". United States. https://doi.org/10.2172/6822. https://www.osti.gov/servlets/purl/6822.
@article{osti_6822,
title = {Biological Monitoring Program for East Fork Poplar Creek},
author = {Adams, S M and Christensen, S W and Greeley, jr, M S and Hill, W R and Kszos, L A and McCarthy, J F and Peterson, M J and Ryon, M G and Smith, J G and Southworth, G R and Stewart, A J},
abstractNote = {In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit, a Biologicai Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the compiex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic integrity of EFPC, These tasks are (1) toxicity monitoring, (2) biological indicator studies, (3) bioaccumuiation studies, and (4) ecological surveys of the periphyton, benthic macro invertebrate, and fish communities. Monitoring is currently being conducted at five sites, although sites maybe excluded and/or others added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) concentration of mercury in the adjacent floodplain, (5) appropriate habitat distribution, and (6) access. The sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18 and 19), iocated off the ORR and below an area of intensive commercial and limited light industrial development; EFK 13.8 (also EFK 14), located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1 ). Other sampling sites on EFPC are utilized as appropriate for individual tasks. Brushy Fork (BF) at kilometer (BFK) 7.6 is used as a reference stream in most tasks of the BMAP. Additional sites off the ORR are also occasional 1 y used for reference, including Beaver Creek, Bull Run, Hinds Creek, Paint Rock Creek, and the Einory River in Watts Bar Reservoir (Fig. 1.2).},
doi = {10.2172/6822},
url = {https://www.osti.gov/biblio/6822}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Oct 15 00:00:00 EDT 1998},
month = {Thu Oct 15 00:00:00 EDT 1998}
}