skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Estimated airborne release of plutonium from the 102 Building at the General Electric Vallecitos Nuclear Center, Vallecitos, California, as a result of damage from severe wind and earthquake hazard

Technical Report ·
DOI:https://doi.org/10.2172/6730491· OSTI ID:6730491

This report estimates the potential airborne releases of plutonium as a consequence of various severities of earthquake and wind hazard postulated for the 102 Building at the General Electric Vallecitos Nuclear Center in California. The releases are based on damage scenarios developed by other specialists. The hazard severities presented range up to a nominal velocity of 230 mph for wind hazard and are in excess of 0.8 g linear acceleration for earthquakes. The consequences of thrust faulting are considered. The approaches and factors used to estimate the releases are discussed. Release estimates range from 0.003 to 3 g Pu.

Research Organization:
Battelle Pacific Northwest Labs., Richland, WA (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
6730491
Report Number(s):
PNL-3601; TRN: 81-001770
Country of Publication:
United States
Language:
English