Title: Research and development of a 3 MW power plant from the design, development, and demonstration of a 100 KW power system utilizing the direct contact heat exchanger concept for geothermal brine recovery project. Final report

Technical Report ·
DOI:https://doi.org/10.2172/6664919· OSTI ID:6664919

The design phase for the 100 KW unit consumed the months of May through November 1978, with the final design selected as having a direct contact boiler and condenser, a single-stage radial inflow induction turbine-generator using isopentane as the working fluid, and a single cell ejector-type cooling tower. The unit was constructed on two, forty-foot flatbed trailers between the months of October 1978 and June 1979. Systems start-up testing, in-field modifications, unit operation, and performance testing were performed between July and December 1979. AP and L (Arkansas Power and Light) personnel assumed responsibility of the unit at that time and conducted further maintenance, operations, and testing through August 1980.

Research Organization:
Arkansas Power and Light Co., Little Rock (USA)
DOE Contract Number:
FG05-78ET28456
OSTI ID:
6664919
Report Number(s):
DOE/ET/28456-T1
Country of Publication:
United States
Language:
English