skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: FNAL Booster intensity, extraction, and synchronization control for collider operation

Conference ·
OSTI ID:6599408

Booster operation for collider physics is considerably different than for fixed target operation. Various scenarios for collider physics, machine studies, and P-Bar targeting may require that the intensity vary from 5E10 PPP to 3E12 PPP at a 15 Hertz machine cycle rate. In addition to the normal Booster single turn extraction mode, collider operations require that the Booster inject into the Main Ring a small number of beam bunches for coalescing into a single high intensity bunch. These bunches must be synchronized such that the center bunch arrives in the RF bucket which corresponds to the zero phase of the coalescing cavity. The system implemented has the ability to deliver a precise fraction of the available 84 Booster beam bunches to Main Ring or to the P-Bar Debuncher via the newly installed AP-4 beam line for tune-up and studies. It is required that all of the various intensity and extraction scenarios be accommodated with minimal operator intervention.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
6599408
Report Number(s):
FNAL-TM-1446; CONF-870302-138; ON: DE87009032
Resource Relation:
Conference: Particle accelerator conference, Washington, DC, USA, 16 Mar 1987; Other Information: Portions of this document are illegible in microfiche products. Original copy available until stock is exhausted
Country of Publication:
United States
Language:
English