Title: BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980

Technical Report ·
DOI:https://doi.org/10.2172/6555899· OSTI ID:6555899

During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

Research Organization:
Equity Oil Co., Salt Lake City, UT (USA)
DOE Contract Number:
FC20-78LC10747
OSTI ID:
6555899
Report Number(s):
DOE/LC/10747-11
Country of Publication:
United States
Language:
English