Human-factors engineering control-room design review/audit report: Byron Generating Station, Commonwealth Edison Company
A human factors engineering design review/audit of the Byron Unit 1 control room was performed at the site on November 17 through November 19, 1981. This review was accomplished using the Unit 2 control room appropriately mocked-up to reflect design changes already committed to be incorporated in Unit 1. The report was prepared on the basis of the HFEB's audit of the applicant's Preliminary Design Assessment report and the human factors engineering design review performed at the site. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. The review team was assisted by consultants from BioTechnology, Inc. (Falls Church, Virginia), and from Lawrence Livermore National Laboratory (University of California), Livermore, California.
- Research Organization:
- Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 6488498
- Report Number(s):
- UCID-19475; ON: DE83009219
- Country of Publication:
- United States
- Language:
- English
Similar Records
Human-factors engineering control-room design review/audit: Waterford 3 SES Generating Station, Louisiana Power and Light Company
Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
BYRON-1 REACTOR
CONTROL ROOMS
HUMAN FACTORS ENGINEERING
BYRON-2 REACTOR
REACTOR CONTROL SYSTEMS
CONTROL SYSTEMS
ENGINEERING
ENRICHED URANIUM REACTORS
POWER REACTORS
PWR TYPE REACTORS
REACTORS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
220400* - Nuclear Reactor Technology- Control Systems
210200 - Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled