Title: Healy Clean Coal Project, Healy FCM testing at Niro Air Pollution Control Pilot Facility

Technical Report ·
DOI:https://doi.org/10.2172/6482225· OSTI ID:6482225

In September, 1991, pilot testing was performed at the Niro Air Pollution Control Pilot Plant in Copenhagen, Denmark in support of the Healy Clean Coal Project (HCCP), which is part of the United States Department of Energy (DOE) Clean Coal Technology Ill Program. The HCCP is a proposed new coal fired power plant, located in Healy, Alaska. It consists of a TRW entrained combustion system, coupled with a limestone calciner, which operates in synergism with a Joy/Niro Spray Dryer Absorber (SDA) system equipped with a lime activation system that is designed to increase the utilization of the calcined product for sulfur capture in the SDA. The pilot tests, which were funded by the United States Department of Energy (DOE) and the Alaska Industrial Development and Export Authority (AIDEA), were conducted to investigate the characteristics of the TRW combustor/limestone calciner product, referred to as Flash Calcined Material (FCM) with respect to its ability to remove S0[sub 2 ] in the Joy/Niro Activated Recycle SDA system. This report describes the pilot facility, the test objectives and methods, and the results of the tests.

Research Organization:
Alaska Industrial Development and Export Authority, Anchorage, AK (United States); Joy Environmental Technologies, Inc., Houston, TX (United States)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
DOE Contract Number:
FC22-91PC90544
OSTI ID:
6482225
Report Number(s):
DOE/PC/90544-T6; ON: DE93014937
Country of Publication:
United States
Language:
English